Silent Sanitary UAE
We do the job in one in one day with no mess and no hassles! Here is an example of the steps involved in a typical job.
Remove caulking between tub & tile.
Set up ventilation system if the unit is occupied/thoroughly cover work area other exposed areas /drop cloths & plastic.
Chemically clean tub/ remove all oils/ body soap/ dirt and grime.
Remove waste and overflow cover (when possible) we do not remove the drain unless it is included in the estimate.
Remove any of the old porcelain glaze still left leaving it dull and ready to prime
We repair most chips 100% free with special patching compound.
Sand /blend patched areas/sterilize to remove contamination.
Areas are masked off including the floor and any areas that may have been missed when we first arrived.
Set-up hot turbine air unit/exhaust system
Bonding agent applied to porcelain/permanently fuses the glaze to the porcelain.
Two coats Primer applied
Four part glaze topcoat mixed/ applied.
Tub is sprayed giving you a total of 4 plus coats/leaving you with a very deep high gloss finish.
Areas are cleaned /we remove the masking paper/ pack up our equipment/ inspect the work.
New bead of caulk is applied/reinstall any hardware that was removed.
Care instructions handed out /any questions you may have are answered.
Please note that this process is for porcelain or tile fixtures. The process for fiberglass, Formica, cultured marble is very similar to this.